美女APP下载污污污_另类图片欧美小说校园_图区 自拍 亚洲 小说_久久久女人与动物群交毛片_国产精品露脸张开双腿_日韩不卡综合视频_中国农村河南妇女BBW_来吧天天影视色香欲综合网_日本高清不卡在线一区二区_欧美高清色巴视频在线观看

Telephone:
+86-020-31040276

logo
CONTACT US
  • GuangZhou Huaqin Playground Equipment Co.,Ltd
  • Tel:+86-020-31040276
  • Mail:ftm@cnhuaqin.com

Old

Published:[2018-07-19 02:07:35]  visits:

Old "rotten flood" today into "amusement park"

Hutuohe south of the county on behalf of the county, the old is "watery summer, winter, the white" rotten saline flood, but now it has turned into a head wind, ocean waves, fragrant grass, lakes and mountains, flowers, pine mother, winding streets, beautiful picture of the lake and boating paradise on earth, becomes a good place for leisure and entertainment of everyone. This is completely thanks to the county, the county government to implement projects that benefit - Hutuo Wetland Park.

     Hutuohe Wetland Park Phase II project investment budget of 73 million yuan, is an ecological benefit, flood control benefits and leisure and entertainment as an integrated project, is an extension of a project to extend Wetland Park covers an area of 300 acres. Beautifully stylish atmosphere but pretty Wetland Park, became the county's oxygen bar, the public amusement park.

     Hutuohe Wetland two works as a county this year's "health town" of key projects, broke ground on March 18, launched the construction team of 300 people, the use of operating machinery more than 60 units, three engineering teams mutual coordination and close cooperation , roaring, day and night construction. With the strong cooperation of housing construction, water conservancy, electricity, environmental protection and the Museum of the town of villagers and strong support, particularly focusing on the promotion of the project legal system, the bidding system, supervision system, so that all construction projects to promote the smooth, engineering, quality progress effectively protected, guaranteed to be completed and put into use by the end of August. Square Playground Equipment

     Hutuohe Wetland Park Phase II project, mainly by the civil works, greening projects, dike three parts. Civil engineering, spent a total of 400,000 cubic meters of earth to build five small square, a kite park, a stadium, 2700 meters Park Road, 3 parking, two pavilions, a flower greenhouses, four toilets. Installation of solar street lights 160, equipped with stone bench 110, trash 120. Square was built photo exhibition showcase more than 50 pieces. Increasing the viewing stone over 50 blocks and a magnificent viewing platform, supporting the power and water supply facilities, the addition of fencing, maintenance of equipment and fitness equipment. Greening project, planting a weeping willow, Sophora japonica, floor wax, Luan trees, and other species bungeana 4800, cultivated a hedge and over 10 kinds of seasonal flowers, lawn 170,000 square meters built, as far as possible to protect the existing trees, new green space in southern town 1900 acres. Dike, play loose stakes 2800 Masonry 3900 m3, dry stone 1200 cubic meters, 1200 meters newly built dike Hutuohe, tigers Temple River dike 500 meters, 600 meters additional bluestone railing, sunset red Lookout railing 307 meters. Dikes were built above 9 meters wide sidewalks, lanes, and supporting the biological slope 12,000 square meters, and dredging Hutuo 1.7 km.


Home About us NEWS Products Support Exhibition Video Contact us 中文
Online Message
GuangZhou Huaqin Playground Equipment Co.,Ltd